Sign In  |  Register  |  About Corte Madera  |  Contact Us

Corte Madera, CA
September 01, 2020 10:27am
7-Day Forecast | Traffic
  • Search Hotels in Corte Madera

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Bitdeer Announces June 2024 Production and Operations Update

- Significant increase in global contracted power capacity to 2.5 GW
- Initial sample shipments of Sealminer A1 ASICs installed and energized at Bitdeer sites
- Completed tape-out of SEAL02 chip targeting 14 J/TH
- On track to deploy 3.4 EH/s of Sealminer ASICs in Q4 2024

SINGAPORE, July 03, 2024 (GLOBE NEWSWIRE) -- Bitdeer Technologies Group (NASDAQ: BTDR) (“Bitdeer” or the “Company”), a world-leading technology company for blockchain and high-performance computing, today announced its unaudited mining and operations updates for June 2024.

Operational Highlights

  • Self-mined Bitcoin: Mined 179 Bitcoin.
  • Power capacity: Expanded global contracted power capacity to 2.5 GW with 570 MW, 30-year, lease agreement with Monroe County Port Authority in Ohio, U.S.
  • Datacenter: Commenced conversion of 100 MW at Rockdale, Texas site to hydro-cooling, with anticipated completion in Q4 2024.
  • ASIC development:
    • Unveiled SEALMINER technology roadmap, beginning with the SEAL01 at 18 J/TH and progressing to the SEAL04 at 5J/TH by Q2 2025.
    • Initial Sealminer A1 ASIC samples received and energized at Bitdeer sites for testing.
    • Completed tape-out of SEAL02 chip, targeting a chip efficiency of 14 J/TH. Masks and wafers expected to be delivered in Q3 2024.
    • Initiated R&D of SEAL03 chip, targeting a chip efficiency of 10 J/TH.
  • HPC and AI cloud services: AI cloud services powered by NVIDIA DGX SuperPOD with H100 system demonstrated strong demand by customers and crossed 75% utilization during the month.

Management Commentary

“In June, Bitdeer made substantial progress in advancing our strategic initiatives in Bitcoin mining and HPC and AI,” stated Linghui Kong, Chief Business Officer of Bitdeer. “We entered into a 30-year lease agreement with Monroe County Port Authority for 570 MW of ready-to-use power infrastructure. This deal increases our total global contracted power capacity to 2.5 GW, positioning us with one of the industry’s largest power development platforms. This deal not only enhances our operational and strategic flexibility but also supports our ambitious growth objectives in Bitcoin mining and HPC and AI.”

Mr. Kong added, “In June, we also successfully energized the first batch of Sealminers into our datacenters and began rigorous testing. Additionally, we completed the tape-out of our 14 J/TH SEAL02 chip and expect wafer delivery in Q3 2024. We remain on schedule to deploy 3.4 EH/s of our own ASIC technology into our datacenters in Texas and Tydal, Norway by the fourth quarter of 2024, bringing our total proprietary hash rate to 11.8 EH/s by year-end.”  

Production and Operations Summary

MetricsJune 2024May 2024June 2023
Total hash rate under management1 (EH/s)22.322.418.8
- Proprietary hash rate8.58.46.2
• Self-mining7.36.94.6
• Cloud Hash Rate1.21.51.6
- Hosting13.814.012.6
Mining machines under management223,000225,000199,000
- Self-owned286,00086,00070,000
- Hosted137,000139,000129,000
Bitcoin mined (self-mining only)179184239
    

1 Total hash rate under management as of June 30, 2024 across the Company’s three primary business lines: Self-mining, Cloud Hash Rate, and Hosting.

  • Self-mining refers to cryptocurrency mining for the Company’s own account, which allows it to directly capture the high appreciation potential of cryptocurrency.
  • Cloud Hash Rate offers hash rate subscription plans and shares mining income with customers under certain arrangements. The Cloud Hash Rate stated above reflects the contracted hash rate with customers at month-end. However, throughout the month, the Cloud Hash Rate may transition to Self-mining hash rate if customers opt to not make their monthly electricity payments for various reasons.
  • Hosting encompasses a one-stop mining machine hosting solution including deployment, maintenance, and management services for efficient cryptocurrency mining.

2 Self-owned mining machines are for the Company’s self-mining business and Cloud Hash Rate business.

Power Infrastructure Summary

Site / LocationCapacity (MW)StatusTiming3
Energized capacity   
Rockdale, Texas563OnlineCompleted
Knoxville, Tennessee86OnlineCompleted
Wenatchee, Washington13OnlineCompleted
Molde, Norway84OnlineCompleted
Tydal, Norway50OnlineCompleted
Gedu, Bhutan100OnlineCompleted
Total energized capacity 895  
Pipeline capacity   
Tydal, Norway Phase 140In progressQ4 2024
Tydal, Norway Phase 2135In progressMid 2025
Massillon, Ohio221In progressMid-to-late 2025
Clarington, Ohio Phase 1266In progressQ3 2025
Clarington, Ohio Phase 2304Pending approvalEstimate 2026
Jigmeling, Bhutan500In progressMid-Late 2025
Rockdale, Texas179In planningEstimate 2026
Total pipeline capacity1,645  
Total global contracted capacity2,540  
    

3 Indicative timing. All timing references are to calendar quarters and years.

Upcoming Conferences and Events

  • July 10: The CEO Summit Investment Conference – San Francisco
  • July 24 – 26: Bitcoin Nashville

About Bitdeer Technologies Group

Bitdeer is a world-leading technology company for blockchain and high-performance computing. Bitdeer is committed to providing comprehensive computing solutions for its customers. The Company handles complex processes involved in computing such as equipment procurement, transport logistics, datacenter design and construction, equipment management, and daily operations. The Company also offers advanced cloud capabilities to customers with high demand for artificial intelligence. Headquartered in Singapore, Bitdeer has deployed datacenters in the United States, Norway, and Bhutan. To learn more, visit https://ir.bitdeer.com/ or follow Bitdeer on X @ BitdeerOfficial and LinkedIn @ Bitdeer Group.

Investors and others should note that Bitdeer may announce material information using its website and/or on its accounts on social media platforms, including X, formerly known as Twitter, Facebook, and LinkedIn. Therefore, Bitdeer encourages investors and others to review the information it posts on the social media and other communication channels listed on its website.

Forward-Looking Statements

Statements in this press release about future expectations, plans, and prospects, as well as any other statements regarding matters that are not historical facts, may constitute “forward-looking statements” within the meaning of The Private Securities Litigation Reform Act of 1995. The words “anticipate,” “look forward to,” “believe,” “continue,” “could,” “estimate,” “expect,” “intend,” “may,” “plan,” “potential,” “predict,” “project,” “should,” “target,” “will,” “would” and similar expressions are intended to identify forward-looking statements, although not all forward-looking statements contain these identifying words. Actual results may differ materially from those indicated by such forward-looking statements as a result of various important factors, including factors discussed in the section entitled “Risk Factors” in Bitdeer’s annual report on Form 20-F, as well as discussions of potential risks, uncertainties, and other important factors in Bitdeer’s subsequent filings with the U.S. Securities and Exchange Commission. Any forward-looking statements contained in this press release speak only as of the date hereof. Bitdeer specifically disclaims any obligation to update any forward-looking statement, whether due to new information, future events, or otherwise. Readers should not rely upon the information on this page as current or accurate after its publication date.

For investor and media inquiries, please contact:

Investor Relations
Orange Group
Yujia Zhai
BitdeerIR@orangegroupadvisors.com

Public Relations
Wachsman
Bee Shin
bitdeer@wachsman.com


Primary Logo

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 CorteMadera.com & California Media Partners, LLC. All rights reserved.